Search
Log In
Code
LK08.22
Season
2008
Narrative

The trench was dry today so we resumed work in the interior. Will continue to work on locus 02 in the future, perhaps after the next rain. Today I created a new locus along the northeast third of the trench, locus 11. In the course of excavating this locus, we exposed another course of the northeast wall. I suspect that this will be the last locus above the floor in this area (assuming the floor is preserved). The matrix is a medium brown silt that is a bit clayish and rocky (with small stones). In areas, I'm seeing clay lenses and what appear to be dark patches of soil rich in organic materials.