Today Tiffany was home ill so I took over C3. Other operations proceeded as follows.
ET1: Belinda was working to define wall and found nothing. She is proceeding very carefully but no faces have presented themselves. She is removing rocks and proceding through layer of fall.
C5: Armine today finished cleaning the trench and came up with one last interesting find--a stone basin dug into a stone lying just below her stone floor. It appears to be LBA in date juding from construction and a single sherd found inside the basin. We photographed the basin with the floor running over it and will now remove those three stones that obstruct us from full excavation.
C3: Area D, defined the bottom of the pit adjacent to the west balk and have now finished Area D.
Area C: Hasmik largely finished drawing the plan of this operation. Area B: worked extensively here to clean the top of the main wall, outline the floor in B and the pebble/black clay floor in BE. Stone cutter cam and removed two large pieces of fall from BE. Also removed two large stones in AE, will remove last of these tomorrow and we will be clear to proceed in AE again.