This is a cleaning locus from T27 and therefore it includes the soil used to backfill T27 in 2010 (and necessary to hold the plastic tarps in place), and also whatever soil/matrix must have eroded from the W baulk of T27 (which is now the E edge of T32). No elevations/measurements were possible since this is a cleaning locus.