A new operation, 2 x 2m, located on the summit of the site, to the south of operation 10. I laid of the trench so that it straddles a linear alignment that appears to be a wall bisecting the citadel. Not sure which side of this alignment might be an interior, and which an exterior. Will likely expand accordingly.
Code | Place Type | Operation | Season | Supervisor | Actions |
---|---|---|---|---|---|
Ar/An.14.01 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.02 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.03 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.04 | Built | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.05 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.06 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.07 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.08 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.09 | Built | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.10 | Built | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.11 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.12 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |
Ar/An.14.13 | Subsurface Deposit | Operation 14 | 2016 | Lori Khatchadourian | View |