This locus is the cleaning of the top layer of the extension of T22. This trench extends 5 m to the W of the 2008 excavation in T22. It was arbitrarily laid out as 5 m wide since no architecture was visible down the slope. It begins at the edge of the wall which designates the separation between the 2008 excavation in T22 and the new 2010 T22 extension. The top elevation is taken from the top of the wall which divides the W edge of trench from 2008 T22. The bottom elevation is taken from center of locus down slope of this wall. Beneath L100, three new loci were opened: L101 which is the cleaning of the wall; L102 just downslope of the wall; and L103 further downslope from L102.