Sample was taken from between the stones used to construction the wall between T22 2008 and T22 2010. It was taken from an elevation of 2296.24 m, 1.90 m from N baulk, 1.45 m from the W edge of the locus. This sample is small, but has the potential to date the construction of this wall as it was found in between the stones.