A test trench 15 m east of operation 05a in an east-west transact of test soundings set on the eastern slope. The operation is set on the outer edge of the uppermost terrace on the east slope.
Code | Place Type | Operation | Season | Supervisor | Actions |
---|---|---|---|---|---|
Ar/An.05b.01 | Subsurface Deposit | Operation 05b | 2016 | Adam Smith | View |
Ar/An.05b.02 | Subsurface Deposit | Operation 05b | 2016 | Adam Smith | View |
Ar/An.05b.03 | Subsurface Deposit | Operation 05b | 2016 | Adam Smith | View |
Ar/An.05b.04 | Subsurface Deposit | Operation 05b | 2016 | Adam Smith | View |
Ar/An.05b.05 | Subsurface Deposit | Operation 05b | 2016 | Adam Smith | View |
Ar/An.05b.06 | Subsurface Deposit | Operation 05b | 2016 | Lori Khatchadourian | View |
Ar/An.05b.07 | Subsurface Deposit | Operation 05b | 2016 | Lori Khatchadourian | View |
Ar/An.05b.08 | Built | Operation 05b | 2016 | Lori Khatchadourian | View |