This Locus was created to address the soil change directly below Locus 11 in the interior of the room in Mirak Operation 02. This Locus is in the E corner of the trench over all. It addresses the change in soil after all the large rocks had been deemed collapse and removed. As more stones were removed from the SE side of the trench the materials under those, until the soil was taken down to be level with Locus 16 (directly below) were added to this locus.
No Entities